Solar Panels in San Antonio: Hail, Heat and a Municipal Utility

Excellent sun and a utility that has supported solar for years — with hail and roof heat as the local complications.

San Antonio has strong sun and a municipal utility with a long record of supporting residential solar, which is why arrays are common here. The complications are local and specific: this is hail country, so the modules are exposed to impact in a way that an installer from a milder market may not plan for; the heat that makes the sun valuable also costs production, because a module loses efficiency as it gets hot; and the roof underneath may be a 1960s or 1970s covering at the end of its life. A quote that covers only the modules answers none of that.

Hail is a design input

Modules carry an impact rating, and mounting height, tilt and the exposure of the array all affect how much hail reaches it. On a low-slope or flush-mounted array the panels are more exposed than on a steep roof, and the same storm that damages a shingle roof may also crack a module in a way that reduces output without being obvious. Ask what the impact rating of the proposed modules is, what the warranty says about hail, and how the array's mounting affects its exposure — and confirm what the property insurance does with a solar array.

Heat costs production

A module's rated output is measured under standard conditions that do not include a 100°F roof, and in this climate the temperature coefficient is a real number rather than a footnote. Mounting with an air gap and avoiding a flush installation where the roof cannot shed heat both help. Ask how the production estimate accounts for temperature, what the module's temperature coefficient is, and whether the design has been modelled for a hot roof rather than a laboratory.

The roof has to outlast the array

An array is a decades-long commitment mounted on a covering with its own clock. On the older third of the stock, the roof may already be near replacement, or may have been hail-damaged and repaired rather than replaced. Removing and reinstalling panels later is an extra cost that no first quote includes, and it puts the penetrations through a second cycle. Ask the age and condition of the covering, whether it has been inspected after hail, and what the arrangement is if it has to be replaced.

One utility, one process

Because a single municipal utility serves this metro, the interconnection process is consistent — and so is the queue. The application, the review and the approval all run through the same organization, which makes the timeline predictable but not necessarily short, and it also means the compensation arrangement for exported power is set in one place. Ask what the current export arrangement is, how the design accounts for it, who files the application, and what the timeline has been recently.

Storage and the evening load

The valuable hours for a household here are the evening ones, when air conditioning is still running and the sun is going down, which is why storage comes up in almost every design conversation. It is a legitimate addition where it shifts consumption, and an expensive one where it does not. Ask whether the storage is sized to the evening load rather than to the array, and what the system does on a day when the grid is down.

What to pin down in the estimate

- What impact rating do the modules carry, and what does the warranty say about hail? - How is the array mounted, and does that change its hail exposure? - How does the production estimate account for module temperature? - What is the age and condition of the roof, and has it been inspected after hail? - What is the current export arrangement, and how is the design shaped by it? - Who files the interconnection, and what timeline applies?

Where this page stops

No system sizes, prices or production figures are quoted here. Tariffs, interconnection rules and incentive programs change, so current terms should be confirmed with the utility and the state authorities rather than taken from any page.

San Antonio metro context

The 2024 ACS 5-year estimates describe about 2.66 million residents in 967,488 households and 1,057,823 housing units, with 63.3% owner-occupied and 66.1% single-family detached — one of the highest detached shares in this dataset, which is why most arrays here go on individually owned roofs. About 32.7% of units predate 1980. At the reference station July averages 84.8°F on 32.4 inches of annual precipitation.

San Antonio reference station and housing indicators

NOAA NCEI 1991–2020 normals for San Antonio International Airport (USW00012921); U.S. Census Bureau ACS 2024 5-year estimates.
IndicatorValueSource
January mean temperature52.2°FNOAA NCEI
July mean temperature84.8°FNOAA NCEI
Annual precipitation32.4 in.NOAA NCEI
Metro population2,662,733U.S. Census Bureau
Owner-occupied share63.3%U.S. Census Bureau
Housing units built before 198032.7%U.S. Census Bureau

Station normals are historical averages for one location, not a forecast. A high summer mean is both the reason solar works here and the reason a module produces less than its rating.

Frequently Asked Questions

Will hail destroy my panels?

Modules carry an impact rating and most survive ordinary hail, but this is hail country and the exposure varies with tilt and mounting. It is worth checking the rating and the warranty language, and confirming what the property policy covers.

Why is my production lower than the estimate in summer?

Heat. A module loses efficiency as its temperature rises, and a roof in this climate gets very hot. A production model that ignores temperature will overstate summer output.

Should I replace the roof first?

If the covering is near the end of its life, yes. Removing and reinstalling an array later is an extra cost, and it puts the penetration seals through a second cycle.

Does the mounting height matter?

It affects both heat and hail exposure. A mounted array with an air gap sheds heat better than a flush installation, and its exposure to impact is different as well.

How does billing work for the power I export?

The utility sets the arrangement, and it has changed over time. Ask what currently applies to the address and how the design accounts for it, rather than relying on what a neighbor's older system gets.

How long does the utility step take?

It varies, and it is usually the longest part of the project relative to the installation itself. Ask the contractor for their recent experience rather than a generic estimate.

Sources and review date

Reviewed on 2026-11-18.